Expansion of Tube Making Line
In order to meet the ever increasing demand of steel tubes, the factory has conducted a project feasibility study and found out that the project is feasible. Therefore the project is now on the process of being launched with a capital of Birr 138 million.

Copyright © 20011 KALITY METAL PRODUCTS FACTORY(KMPF)| All Rights Reserved

Designed and powered by MISS